Smartroad Gotland

News and field notes

Learning from the road, one update at a time.

Browse the Smartroad Gotland archive for reports on wireless charging, installation work, testing and the wider shift toward electric transport infrastructure.

Freight truck travelling on an open road for Smartroad Gotland news
The road notebookTechnical milestones and practical observations from electric-road development.

Archive

Reports from development and testing

These articles document project milestones and industry activity. Dates have been arranged as an editorial archive, with the latest entry no later than 21 August 2026.

Truck travelling along a road during an electric-road field update
1 min read

Smartroad Gotland presented at TRA22

A concise look back at the electric-road presentation and the technical themes discussed with transport researchers.

Read the update →
Vehicle moving through a northern road landscape
1 min read

Wireless charging technology installed in northern Sweden

A short road section demonstrates how embedded charging equipment can be integrated in a northern climate.

Read the update →
Long road section through green countryside
1 min read

Successful upgrade of 400 metres

The high-speed section received an infrastructure upgrade across a 400-metre stretch in one travel direction.

Read the update →
Road construction equipment preparing infrastructure
1 min read

Successful upgrade of the first 50 metres

An early section of electric road was updated with a newer version of the underlying system infrastructure.

Read the update →
Electric public transport vehicle on a city road
1 min read

Wireless electric roads in the news

A media feature introduced dynamic wireless charging and showed how a vehicle interacts with equipped road infrastructure.

Read the update →
Road network extending through a developed landscape
1 min read

The electric-road programme is extended

An extension created more time for operation, observation and evaluation of the charging system in everyday conditions.

Read the update →
Vehicle in motion on a winding test road
1 min read

Full operation begins

The project reached an operating milestone as vehicles, roadway equipment and energy controls began working together.

Read the update →
Open rural road suitable for controlled vehicle testing
1 min read

High-speed charging test

A truck test examined wireless energy transfer at 80 km/h and added operational evidence from the road.

Read the update →
Road installation works viewed from the carriageway
1 min read

Installation is finished

Completion of the embedded road equipment opened the way for commissioning, monitoring and vehicle tests.

Read the update →

How we cover the subject

Updates with useful context

Smartroad Gotland treats every milestone as part of a larger road-and-energy system. Reports focus on what changed, which part of the system was involved and why the work matters.

01. Observe

Identify the road, vehicle, power or operating issue behind an update.

02. Clarify

Explain technical terms without separating them from real road use.

03. Connect

Relate each development to installation, safety and maintenance.

04. Archive

Keep a readable record that supports further research.

Go deeper

Understand the system behind the updates.

News makes more sense when road coils, vehicle receivers and energy control are viewed together.

Explore the technology
Traffic moving through a modern road environment