Higher-power road section
Construction of a 50-metre wireless electric-road section intended to test power transfer above the level previously used in the wider road project.
Energy pilot
The Gotland pilot examined higher-power transfer, static induction and vehicle integration to build practical knowledge around wireless charging infrastructure.
Completed pilot · 2021–2023About the pilot
The completed project brought together several measures connected with wireless electric-road technology. Funding came from the Swedish Energy Agency and the European Regional Development Fund within the Energy Pilot Gotland programme.
The work addressed how dynamic road charging, stationary induction and compatible vehicle receivers could be examined at system level. Alongside physical construction and integration, the scope included location-based case studies and analysis of test results.
Project scope
The pilot combined infrastructure, charging configurations, vehicle hardware and analysis to explore more than one operating situation.
Construction of a 50-metre wireless electric-road section intended to test power transfer above the level previously used in the wider road project.
A stationary charging installation using the same inductive approach, supporting learning about static charging and coordination with dynamic supply.
Integration of energy receivers on both truck and trailer to examine the opportunity for charging at higher power.
A case study examining wireless charging at a loading dock and the operating questions that arise around that use case.
A separate case study used to consider the technology in another transport and infrastructure context.
Analysis brought observations from the technical measures together to support a clearer system-level view.
What was included
Wireless transfer may happen while a vehicle is moving or while it is stationary. The pilot explored how these modes could use a related technical foundation and how vehicle-side equipment fits into the complete system.
How the work connected
Each area addressed part of the journey from electrical infrastructure to a compatible vehicle and an observable test result.
Create road and stationary charging environments using wireless induction.
Fit suitable receiving equipment to the truck and trailer configuration.
Consider dynamic, static and loading-dock use in their operating contexts.
Review tests and bring the separate technical questions into one system view.
Why combine the modes?
A vehicle may require energy while travelling, at a depot or during loading. Looking at dynamic and stationary induction together makes it possible to ask how common infrastructure principles could serve different parts of that cycle.
The pilot’s case studies also recognised that a technical solution has to be understood in its road, freight and site context. Route patterns, stopping behaviour, vehicle configuration and available energy infrastructure all shape the practical question.

Pilot questions
Key distinctions within the historical pilot scope.
No. The documented project ran from autumn 2021 until March 2023. This page presents its scope as completed historical project information.
It was constructed to test higher power transmission than had previously been used on the wireless road project.
It enabled work on static induction charging and supported investigation of how stationary and dynamic charging could be coordinated at system level.
The integration was intended to explore the opportunity to charge at higher power using receiving equipment across that vehicle configuration.
No. It also included loading-dock and Stockholm case studies as well as test analysis.
No. A vehicle needs compatible receiving equipment and must meet the system’s operating and authorisation requirements.
Ask about the pilot
Contact Smartroad Gotland with a focused question about the documented energy pilot and wireless charging context.